To print this page properly - use Print icon located on the page.
To print this page properly - use Print icon located on the page.
Please note that JavaScript has to be enabled.
Home
About Us & Contact
Board of Directors
Contact Us
Sign up for Updates
News Blog
Events
Learning and Reference Library
Links
Downloads
Checklist for Design & Construction
Find a Professional
Forums
Modeling and Simulation
Building Envelope
Mechanical Systems
West Coast & Mountain
Prairies
Ontario
Québec
East Coast
North and Sub-arctic
Membership Application
Members Only
E-mail
Password
Remember me
Forgot password
Checklist for Passive House Design & Construction
This checklist is intended to make it easier to reach certified Passive House standard by listing the most important steps in the process and particularly draw the attention to the quality control process that must accompany the Passive House construction process. This list does not claim to be complete or list all items and issues needing consideration, only to provide an outline of the process. This is a work in progress. The current version can be downloaded from PHI's web site. The terminology is largely based on the UK planning process, etc.
NOTE: Items in
bold
below require specific quality control steps.
1. Site planning
How suitable is the site for a Passive House
Does the site have access and utilities connections?
Is planning permission for a Passive Houselikely?
Is a compact building shape possible? Terraced houses or larger blocks are an advantage.
Is a southerly orientation (±30°) and large south-facing window areas possible?
Consider shading factors preventing the use of solar gains - any trees with conservation orders?
2. Pre-planning
Compact buildings - possible to extend existing buildings to get fewer external walls?
Dimension south-facing glazing for solar gains. Dimension east/north/west facing glazing for sufficient light, not larger than necessary.
Minimise winter shading:
garden walls
vegetation
balconies
roof overhangs
outbuildings.
Simple envelope shape, if possible avoid steps in walls, dormer windows, etc. Clearly define the thermal (heated) envelope and the airtight layer.
Floor plans:
make installation zone(s) compact and concentrated, e.g. by placing bathrooms above or next to kitchens, etc.
consider routing of, and space for, ventilation ducts.
Separate cold basement if present:
airtight
no cold bridges.
Acquire local climate data in a form suitable for use with PHPP. Verify if calculated by Meteonorm or similar interpolation software.
Carry out the first iterations of PHPP to see if the ideas add up in Passive House terms.
Contact local Planning Office to discuss initial ideas and site plan.
3. Planning towards Passive House realization
Plan wall/foundation/roof construction and insulation thickness.
Avoid cold bridges in the design - modify as required. Mitigate by minimising or optimising cold bridging if avoidance is impossible.
Plan in enough space for building technology. Make sure there is space and access for regular maintenance.
Floor plans:
short pipe lengths for cold, hot and waste water
short ventilation ducts - cold air ducts outside the heated envelope, warm ducts inside
4. Planning: building elements
Ultra-insulated construction elements according to Passive House rules, for external elements the rule is U = 0.15 W/(m²K) - strive for 0.1 W/(m²K). Use "Details for Passive Houses" (Springer Verlag, ISBN 978-3-211-29763-6) as a guide (available through Amazon).
Design connection details to eliminate cold bridging - if in doubt calculate and verify.
Design connection details to assure airtightness.
Optimise glazing:
type of glazing
frames/casings
glass area
sun shading, etc.
Calculate the specific space heating demand using PHPP.
5. Planning: ventilation
Routing of ventilation ducts:
keep cold ducts outside the heated envelope. If they need to be inside then only for very short lengths and highly insulated
keep warm ducts inside the heated envelope. If they need to be outside then only for very short lengths and highly insulated
use short ducts with smooth walls
keep flow velocities below 3 m/s throughout
design measurement and flow balancing facilities into the system
consider fire protection
consider noise factors, including noise reduction.
Air inlets:
avoid short-circuiting air flows
consider throw widths
incorporate flow regulation/balancing possibilities.
Air exhausts:
do not place above heating elements (if present).
Dimension overflow openings for a pressure drop delta P <= 1 Pa.
Central ventilation/heat recovery unit:
position heat exchangers close to or inside the thermal envelope. Good positions are inside the heated envelope or in a basement
position air heating units inside the thermal envelope
add additional insulation as required in each case
the unit should meet or (preferably) exceed these data:
overall efficiency >= 75%
leakage to surrounding air < 3% of the rated flow volume
internal leakage (between intake and exhaust air flows) < 3% of the rated flow volume
high electrical efficiency, power consumption < 0.45 Wh/m³ air
have suitable regulation/control facilities
low noise rating
excellent heat insulation.
Ventilation user controls:
settings: high, normal, low
possibly time-limited booster functions in kitchens, toilets and bathrooms.
Kitchen extractors connected to the ventilation system should have good extraction capabilities at a very low flow rate and be fitted with grease filters. However, it is preferable to use circulation only extractors with active coal and grease filters.
Optionally, consider installing a ground heat exchanger to keep intake air frost free. This can either be a ground-to-air exchanger or a ground-to-liquid exchanger with a liquid-to-air exchanger close to the ventilation unit. In some climates this will probably not be required. If required, consider:
airtightness
distance between cold channels and the building
summer bypass/cooling facilities
extraction of condensate
cleaning
6. Designing additional building technology
Sanitation, hot water:
short pipes, very well insulated
routed inside the thermal envelope.
Sanitation, cold water:
short pipes, normal insulation.
Insulate warm water and heating fittings.
Use water-saving taps, etc.
Connect washing machines and dish washers to the hot water supply.
Waste water:
short branch pipes, preferably a single (internal) discharge stack
preferably, the stack should be ventilated into a roof void, otherwise through an insulated external pipe.
Sanitation and electrical/communications installations should preferably not penetrate the airtight layer but be cast into the foundation and sealed. In case the airtight layer has to be breached an efficient seal must be ensured (sleeves, tape, sealant).
Use energy efficient appliances, the most modern models. The inventory should be sensible vis-a-vis PHPP
7. Construction phase - envelope
Site management
: Check that all materials supplied actually correspond to the materials specifications. Run a clean site with minimal waste.
Freedom from cold bridges
. On-site quality control.
Integrity of the insulation.
Unbroken insulation layers - no gaps in insulation materials.
Airtightness:
Check transitions, e.g. between walls and floors, seals where pipes, cables or flues are carried through the airtight layer and seams that form part of the airtight layer while still accessible.
Airtightness:
Carry out a pressure test as early in the construction phase as possible!
As soon as the airtight envelope is finished and while it is still accessible, i.e. before fixes (coordinate with relevant trades).
How? n50-test using a blower door or the ventilation system. All leaks must be located while the building is pressurised (smoke, handheld anemometer, if necessary, thermography).
8. Construction phase - ventilation
Airtightness. Check that piping and duct-work conserve the integrity of the airtight envelope.
ducts: make sure they are clean and leak free
central ventilation unit: check accessibility for filter change and noise reduction measures
check duct insulation - is it present where required and correctly installed?
Flow settings in normal operation:
measure intake and exhaust air flows - compare them to ensure they are balanced
compare fresh and stale air distribution
measure electrical power consumption
9. Construction phase, after fixes - additional building technology
Airtightness
: ensure that airtightness is preserved when installations are carried through the airtight layer. Consider wall constructions incorporating an internal installation void.
Heat insulation of pipes and fixtures
: check correctness and integrity.
10. Induction of owners and tenants
User manual:
binder with user instructions, technical manuals for equipment, warranties and contact details for service and maintenance functions
11. Certification
Apply for a
Quality-Assured Passive House
certificate from the
Passive House Institute
or authorized representative
Thanks to Niels Bjergstrom from Zero-Carbon Solutions for the English translation.
© Passive Buildings Canada
Powered by
Wild Apricot
integrated
website software
for
Nonprofit
and
Association Management
:
Membership Management
,
Website Builder
,
Online Fundraising
and
Event Registration